![]() |
21.90 €incl. VAT | plus Shipping Cost
|
The installation of the steam generator requires a 7 mm hole to be drilled in the housing in place of the original chimney. In order to obtain a precise hole, it is advantageous to pre-drill with 3 or 4 mm. Glue the heat insulation ring into the hole using a fast-setting adhesive. Before the glued joint is hard and the insulating ring can no longer be moved, it is aligned vertically with the steam generator inserted. Before final installation, the steam generator is pushed into the conical sleeve, which serves as the new chimney. Remove any burrs from the insulating ring and cone sleeve so that the steam generator can be pushed in easily. One connecting wire is connected to earth, the other to a live point.
Modellbahnshop - Division of KORN e.K. KORN e.K. Inhaber: Denis Korn Thomas-Müntzer-Straße 4 04758 Oschatz Deutschland USt-ID-Nr.: DE 165 839 418 eingetragen im Handelsregister des Amtsgerichtes Leipzig Handelsregisternummer HRA 16661 WEEE-Reg.-Nr. DE 12745699 |
Business hours
|