Auhagen 13348 Spillanlage
Delivery time: 1 ‐ 2 business days (Germany)
Check availability in store:
- Oberwiesenthal: not on stock *
- Oschatz: can be picked up immediately
- * The product can be delivered to this store within 2-4 business days. Simply select the "Pickup to Store" type of delivery during the checkout prozess.
Share with friends:
Auhagen 13348 Spillanlage Product Details
A capstan system, or more correctly a rope shunting system, is used to move wagons on loading tracks, in factory yards, under loading facilities and the like. Where it was not possible to use a shunting locomotive, shunting by means of a rope pulled by a winch used to be a widespread alternative.Four filigree, movable pulleys and the enclosed rope make our replica functional. The prototypical winch house with interior fittings is used in the model to cover the drive motor underneath.
Features:
- Track size: TT
- Dimensions: 41 x 20 x 23 mm
- Functional model including motor
Specs:
- Gauge: TT
- Type: Accessories
Further links:
CAUTION: Not suitable for children under 3 years. Danger of swallowing! Age recommendation from 14 years.